BLDG Mixed Use

  Engineering Design

 

Photo Photo Photo Photo Photo Photo Photo
Photo Thumb
Photo Thumb
Photo Thumb
Photo Thumb
Photo Thumb
Photo Thumb
Photo Thumb

Description

This was an existing 11,000 square foot industrial building which was converted to a mixed use office/retail/workshop. Greenwise Solutions provided Structural, Mechanical, Electrical, and Plumbing Engineering services. Our goal for this project was to integrate as much efficiency and stainability into the design which in turn we were awarded for. We received the SDGE Energy Efficiency Integration Award in 2007.






Scope of Work

  • « Retrofit Existing Building
  • « High Efficency HVAC System
  • « Load Calculation and Design
  • « Low E Windows
  • « Energystar Lighting
  • « Water Filtration System
  • « Energystar Appliances
  • « Minimum Waste Factor
  • « Low Volatile Materials